Skip to main content
Search...

Advance Building Solution

Advance Building Solution of c. 3,189 m² (approx. 34,334 ft²) on a site area of c. 2.34 hectares (c. 5.78 acres). Within lies a Technology / Manufacturing space of c. 1,537m² (c. 16,544 ft² ) with roller shutter doors to service yard. This is accompanied by a two storey office accommodation of c. 1,157m² (c. 12,545 ft² ) and high-profile double height atrium at reception. Access to 2 Technological Universities - (Carlow and Waterford) within the region. Other companies in the region include MSD, Unum, Netwatch and Alltech

Carlow Advance Building Solution

AVAILABLE NOW
Ideal home for manufacturing and international service companies

Building Details

  • Advance Building Solution of c. 3,189 m²(c. 34,334 ft²) on a site area of c. 2.34 hectares (c.5.78 acres)
  • Technology / Manufacturing space of c.1,679 m²(c.18,077 ft²) with roller shutter doors to service yard
  • Clear internal eaves height of c. 7.20 m
  • Ancillary space totalling c.1,157 m² (c.12,454 ft²) including office space overtwo floors (with raised access floors, suspended ceilings, lighting, air conditioning) showers, toilets and common areas
  • Surface car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite

Sustainability

  • Energy Rating (BER) Certification B1
  • Designed to achieve LEED CS accreditation and nZEB compliance

Advance Building Solution of c. 3,189 m² on a site area of c. 2.34 hectares

Energy Rating (BER) Certification B1

car parking for 70 cars, 4 accessible, 2x EV charging terminals and cycle parking onsite

Clear internal eaves height of c. 7.20 m

Base Specifications

Attribute
Production Space
Production Space
c.18,077
SQF
Ground Floor Office
Ground Floor Office
c 4,187
SQF
First Floor Office
First Floor Office
c.4,219
SQF
Total Floor Area
Total Floor Area
c. 34,334
SQF